Circa 1923, Upper West Side Craftsman was recognized as a "Green Building" following its renovation in 2010. Incorporation of energy-efficient amenities include kitchen appliances, reverse osmosis water system, furnace, tankless water heater, dual-pane windows, LED lighting, low flow toilets, and drought tolerant landscaping. This functional open-concept layout flows very well, accommodating 3 bedrooms, 2 full baths, generous laundry with mud room, robust kitchen with breakfast bar, formal dining area, and living room. Natural light radiates throughout vaulted living, dining, and kitchen areas. Fencing placement and lot configuration is adjacent to an easement @ the back & west ends of parcel which lends itself well to ideal arrangement of a detached ADU. Potentiality for ADU on parcel to be provided by the City of Santa Cruz Planning,Building,Zoning Depts. 1 mile to UCSC, 2 miles to Steamer's Lane, 1.5 miles to West Cliff Drive, & 1.7 Miles to Boardwalk. Open House 10/23 cancelled.